Substation Scout

Alderwood Tap at substation interconnection queue

2 active projects totalling 1.5 MW in the BPA queue.

2active projects
1.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
G1075 Not reported 115 1.1 Solar STUDY
G1077 Not reported 115 0.4 Solar STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.