Primary: Wendson ; Alternate: Takenitch substation interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
G0811 Not reported 230 600 Other WITHDRAWN
G0812 Not reported 230 600 Battery WITHDRAWN
G0810 Not reported 230 200 Other WITHDRAWN
G0802 Not reported 115 80 Other WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.