Substation Scout

Not reported

BPA queue ID G1077

Queue IDG1077
Project nameNot reported
Status (as published)STUDY
SubstationAlderwood Tap at
Point of interconnectionAlderwood Tap at 115 kV
CountyLane
StateOR
Voltage115 kV
Capacity0.4 MW
Resource (as published)Solar/Photovoltaic
Resource categorySolar (normalised for filtering)
Target commercial operation2025-06-15
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiAlderwood Tap at 115 kV
Generator TypePhotovoltaic
Fuel SourceSolar
Nameplate Mw Total0.4
Max Summer Mw0.4
Max Winter Mw0.4
Reason Not Completed.
Comments400 kW Request

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.