Substation Scout

Lane Substation at substation interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
G0889 Not reported 230 200 Battery WITHDRAWN
G0890 Not reported 230 200 Solar WITHDRAWN
G0891 Not reported 230 200 Solar WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.