Snohomish, WA interconnection queue

9 active projects totalling 45 MW in the BPA queue, plus 4 with terminal status (shown greyed).

9active projects
45active MW
13total filed
Queue IDProjectkVMWResourceStatus
G19 500MW Snohomish 115 500 Gas WITHDRAWN
G18 250MW Snohomish 115 250 Gas WITHDRAWN
G0832 Not reported 115 25 Battery CONST AGRMT EXE
G0370 Young’s Creek Hydro Project n/r 8 Hydro ENERGIZED
G0506 MESA 2 Energy Storage Project n/r 3 Battery ENERGIZED
G0659 Qualco Project 12.5 3 Other ENERGIZED
G0481 Not reported 12 2 Battery Decommissioned (terminated)
G0593 Arlington Microgrid n/r 2 Solar ENERGIZED
G0484 Hardeson Battery Storage n/r 1 Battery ENERGIZED
G0500 Hardeson Battery Storage Expansion n/r 1 Battery ENERGIZED
G0836 Not reported n/r 1 Solar WITHDRAWN
G0943 South Everett Community Solar Project n/r 1 Solar ENERGIZED
G1091 Not reported n/r 1 Solar STUDY COMPLETED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.