Snohomish, WA interconnection queue
9 active projects totalling 45 MW in the BPA queue, plus 4 with terminal status (shown greyed).
9active projects
45active MW
13total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G19 | 500MW Snohomish | 115 | 500 | Gas | WITHDRAWN |
| G18 | 250MW Snohomish | 115 | 250 | Gas | WITHDRAWN |
| G0832 | Not reported | 115 | 25 | Battery | CONST AGRMT EXE |
| G0370 | Young’s Creek Hydro Project | n/r | 8 | Hydro | ENERGIZED |
| G0506 | MESA 2 Energy Storage Project | n/r | 3 | Battery | ENERGIZED |
| G0659 | Qualco Project | 12.5 | 3 | Other | ENERGIZED |
| G0481 | Not reported | 12 | 2 | Battery | Decommissioned (terminated) |
| G0593 | Arlington Microgrid | n/r | 2 | Solar | ENERGIZED |
| G0484 | Hardeson Battery Storage | n/r | 1 | Battery | ENERGIZED |
| G0500 | Hardeson Battery Storage Expansion | n/r | 1 | Battery | ENERGIZED |
| G0836 | Not reported | n/r | 1 | Solar | WITHDRAWN |
| G0943 | South Everett Community Solar Project | n/r | 1 | Solar | ENERGIZED |
| G1091 | Not reported | n/r | 1 | Solar | STUDY COMPLETED |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.