Substation Scout

Not reported

BPA queue ID G0832

Queue IDG0832
Project nameNot reported
Status (as published)CONST AGRMT EXE
SubstationMurray: Snohomish Co PUD Feeder 1
Point of interconnectionMurray: Snohomish Co PUD 115 kV Feeder 1
CountySnohomish
StateWA
Voltage115 kV
Capacity25 MW
Resource (as published)Battery/Energy Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2025-10-31
Source datasetbpa-generation

Tracked changes

1 change observed between weekly snapshots of the BPA queue since BPA tracking began on September 22, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Status change n/a STUDY → CONST AGRMT EXE

Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiMurray: Snohomish Co PUD 115 kV Feeder 1
Generator TypeEnergy Storage
Fuel SourceBattery
Nameplate Mw Total25
Max Summer Mw25
Max Winter Mw25
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.