Substation Scout

Qualco Project

BPA queue ID G0659

Queue IDG0659
Project nameQualco Project
Status (as published)ENERGIZED
SubstationSnohomish distribution (Woods Creek Substation)/ BPA-Snohomish Substation
Point of interconnection12.47 kV Snohomish distribution (Woods Creek Substation)/115 kV BPA-Snohomish Substation
CountySnohomish
StateWA
Voltage12.5 kV
Capacity3 MW
Resource (as published)Biofuel/Reciprocating Engine
Resource categoryOther (normalised for filtering)
Target commercial operation2021-06-01
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

RequestorPublic Utility District No. 1 of Snohomish County
Connection TypeGI
Interconnection TypeERIS
Poi12.47 kV Snohomish distribution (Woods Creek Substation)/115 kV BPA-Snohomish Substation
Generator TypeReciprocating Engine
Fuel SourceBiofuel
Nameplate Mw Total3
Max Summer Mw3
Max Winter Mw3
Reason Not Completed.
CommentsInstalling an additional 1600 kW to an existing 450 kW generator for a total of 2.05 MW

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.