MESA 2 Energy Storage Project
BPA queue ID G0506
| Queue ID | G0506 |
|---|---|
| Project name | MESA 2 Energy Storage Project |
| Status (as published) | ENERGIZED |
| Substation | Everett Substation (Snohomish County PUD) |
| Point of interconnection | Everett Substation (Snohomish County PUD) |
| County | Snohomish |
| State | WA |
| Voltage | Not reported |
| Capacity | 3 MW |
| Resource (as published) | Battery/Energy Storage |
| Resource category | Battery (normalised for filtering) |
| Target commercial operation | 2015-11-01 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Requestor | Public Utility District No. 1 of Snohomish County |
|---|---|
| Connection Type | GI |
| Interconnection Type | ERIS |
| Poi | Everett Substation (Snohomish County PUD) |
| Generator Type | Energy Storage |
| Fuel Source | Battery |
| Nameplate Mw Total | 3 |
| Max Summer Mw | 3 |
| Max Winter Mw | 3 |
| Reason Not Completed | . |
| Comments | 2.2 MW capacity |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.