South Everett Community Solar Project

BPA queue ID G0943

Queue IDG0943
Project nameSouth Everett Community Solar Project
Status (as published)ENERGIZED
SubstationSnohomish
Point of interconnectionSnohomish
CountySnohomish
StateWA
VoltageNot reported
Capacity1 MW
Resource (as published)Solar/Photovoltaic
Resource categorySolar (normalised for filtering)
Target commercial operation2024-09-30
Source datasetbpa-generation

Tracked changes

1 change observed between weekly snapshots of the BPA queue since BPA tracking began on September 22, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Status change n/a STUDY → ENERGIZED

Full change log →

Additional filed fields

RequestorPublic Utility District No. 1 of Snohomish County
Connection TypeGI
Interconnection TypeERIS
PoiSnohomish
Generator TypePhotovoltaic
Fuel SourceSolar
Nameplate Mw Total1
Max Summer Mw1
Max Winter Mw1
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.