Substation Scout

DOUBLE TOLL GATE

Named in 1 PJM planning document for 1 project, on December 5, 2023.

Not stateddescribed as
PJM system-widezone
138kV as printed
1mentions

Same name on other Substation Scout pages

Other sources that print a substation named “DOUBLE TOLL GATE”. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
APS Area and Dominion Area - Short Circuit Upgrades
b3800.401
Not printed $63.27M Not printed Not printed 2023-12-05
TEAC

Other substations in this project

“APS Area and Dominion Area - Short Circuit Upgrades” also names 12 other substations, with what the most recent document says about each.

Every mention

DateDocumentProjectWhat the document says about it
2023-12-05 TEAC
Item 15 - Reliability Analysis Update 2022 Window 3 p. 69
APS Area and Dominion Area - Short Circuit Upgrades No role wording
138

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this