Double Toll Gate substation interconnection queue

1 active project totalling 3.8 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
3.8active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG2-510 Double Toll Gate 138 kV 138 60 Solar Withdrawn
AC2-135 Double Toll Gate 34.5kV 34.5 9.6 Solar Withdrawn
V4-053 Double Toll Gate 138kV 138 7.6 Solar Withdrawn
Z2-030 Double Tollgate Solar Project 34.5 3.8 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.