Substation Scout

Dickerson Station H

Named in 1 PJM planning document for 1 project, on December 5, 2023.

Work described at itdescribed as
PJM system-widezone
230 kVkV as printed
1mentions

Same name on other Substation Scout pages

Other sources that print a substation named “Dickerson Station H”. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

Part of a named transmission project: 2022 Window 3 Northern Virginia/Doubs Cluster ($1,418.3M).

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
2022W3 – Recommended Solutions: Northern Virginia/Doubs Cluster
B3800.243 – B3800.245
Not printed $66.38 M 2028-2030 Not printed 2023-12-05
TEAC

Other substations in this project

“2022W3 – Recommended Solutions: Northern Virginia/Doubs Cluster” also names 4 other substations, with what the most recent document says about each.

Every mention

DateDocumentProjectWhat the document says about it
2023-12-05 TEAC
Item 15 - Reliability Analysis Update 2022 Window 3 p. 47
2022W3 – Recommended Solutions: Northern Virginia/Doubs Cluster “Rebuild 7.26 miles of existing 230 kV circuit from Dickerson Station H to Ed's Ferry area”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this

Site Scanner