Named in 1 PJM planning document for 2 projects, on October 8, 2024.

Existingdescribed as
JCPLzone
230 kVkV as printed
2mentions

Also printed as: West Wharton Substations

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Chester-West Wharton 230 kV Misoperation Relays
JCPL-2019-021 · s3413.1
Not printed $ 2.0 M 10/11/2024 Not printed 2024-10-08
TEAC
Franklin Substation
JCPL-2023-006, JCPL-2023-042 · s3299.1, s3299.2, s3299.3, s3299.4, s3252.1
Not printed $32.0 M 12/31/2025 67 MW 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named FRANKLIN; VERNON; WEST WHARTON SUBSTATIONS → FRANKLIN; VERNON; WEST WHARTON 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 20
Franklin Substation “Replace relaying at Franklin, Vernon, and West Wharton Substations”
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 91
Chester-West Wharton 230 kV Misoperation Relays “Replace relaying and limiting substation conductor at Chester and West Wharton 230 kV Substations”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.