Rockville
Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035).
Described as new. The quoted wording describes building this substation, without the word "new". “Construct the Rockville 500kV switching station” — TEAMS 09662, plan p.130
The plan prints no county for this substation, and no utility project page found names one for it.
Location
33.3278, -83.1860 · Putnam County, GA · view on a map
Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±75 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Symbol anchored: the drawn switching-station footprint (grey stippled rectangle labelled "Proposed Rockville 500 kV Switching Station") on the EA's Figure 8.0 site plan. Rendered at 220 dpi (~1.0 m/px by its scale bar). Affine fit on seven towers drawn as white squares on the existing Eatonton Primary #2 - Wallace Dam 230 kV line (3) and Scherer - Warthen 500 kV line (4), each matched to a vertex of the OSM line (230 kV way 171527959; 500 kV way 164024561 'Warthen - Scherer 500kV'); residuals 0.3-1.3 m, fitted scale 1.00/1.01 m/px. Point is the footprint centre, on the east side of the triangular GPC tract west of Rockville Road. ±75 m.
Sources: 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.130 · 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.252 · Environmental Assessment: East Central Georgia Reliability Projects (USDA Rural Utilities Service for Georgia Transmission; re-published by DOE as DOE/EA-2313), Rockville site plan (April 2025 (DOE re-publication March 2026)), p.ii · DOE/EA-2313 adoption cover sheet, Rockville 500kV Substation project (Georgia Power, Energy Dominance Financing) (2026-03-24), p. 1-2 · OpenStreetMap: Scherer - Warthen 500 kV and Eatonton Primary #2 - Wallace Dam 230 kV lines, Rockville Road (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| GTC: EAST WALTON 500/230kV PROJECT GTC: - Construct the East Walton 500/230kV substation - Construct the Bostwick 230kV switching station - Construct the East Walton - Rockville 500kV line - Construct the Bethabara - East Walton 230kV line - Construct the Bostwick - East Walton 230kV line - Construct the East Walton - Jack's Creek 230kV line - At Bethabara, terminate the East Walton 230kV line - Loop the East Social Circle - East Watkinsville 230kV li… TEAMS 09662 · plan p.130 · zone 212 |
GTC | In the plan p.10 |
Jun 1, 2027 | No change | Bethabara, Bostwick, Doyle, East Social Circle, East Walton, East Watkinsville, Jack's Creek, LG&E Monroe, Rockville, Scherer, Warthen |
Generation interconnection requests filed in Putnam, GA: Southern Company queue, 2 active of 13. Same county, not the same substation.
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.