Bostwick
Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035), in Morgan County.
Described as new. The quoted wording describes building this substation, without the word "new". “Construct the Bostwick 230kV switching station” — TEAMS 09662, plan p.130
County: “Bostwick 230 kV Switching Station (Morgan County)” — Georgia Transmission, East Central Reliability Projects page, retrieved 2026-11-20. The plan itself prints no county column.
Location
33.7706, -83.5101 · Morgan County, GA · view on a map
Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±100 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Symbol anchored: the drawn switching-station footprint (grey stippled rectangle labelled "Proposed Bostwick 230 kV Switching Station") on the EA's Figure 3.0 site plan. Rendered at 220 dpi (~1.0 m/px by its 1,000 ft scale bar). Fitted on two towers drawn on the existing East Social Circle - East Watkinsville 230 kV line (white squares) matched to the vertices of the OSM 230 kV line (way 171540531) at 33.76776,-83.50927 and 33.76998,-83.50419: the drawn spacing (533 px) matches OSM (530 m) and the bearing agrees, so the plan is north-up at the scale bar. Point is the footprint centre, north of High Shoals Road. ±100 m.
Sources: 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.130 · Environmental Assessment: East Central Georgia Reliability Projects (USDA Rural Utilities Service for Georgia Transmission; re-published by DOE as DOE/EA-2313), Bostwick site plan (April 2025 (DOE re-publication March 2026)), p.7-8, Figure 3.0 · Georgia Transmission, East Central Reliability Projects page (with project map east_walton_handout_w_tl_labels.png and mailer map All_Proj_Mailout.png) (n/a (retrieved 2026-11-20)), project descriptions; maps · OpenStreetMap: East Social Circle - East Watkinsville 230 kV line (way 171540531) and High Shoals Road (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| GTC: EAST WALTON 500/230kV PROJECT GTC: - Construct the East Walton 500/230kV substation - Construct the Bostwick 230kV switching station - Construct the East Walton - Rockville 500kV line - Construct the Bethabara - East Walton 230kV line - Construct the Bostwick - East Walton 230kV line - Construct the East Walton - Jack's Creek 230kV line - At Bethabara, terminate the East Walton 230kV line - Loop the East Social Circle - East Watkinsville 230kV li… TEAMS 09662 · plan p.130 · zone 212 |
GTC | In the plan p.10 |
Jun 1, 2027 | No change | Bethabara, Bostwick, Doyle, East Social Circle, East Walton, East Watkinsville, Jack's Creek, LG&E Monroe, Rockville, Scherer, Warthen |
| GTC: BOSTWICK - EAST SOCIAL CIRCLE 230kV RECONDUCTOR Reconductor approximately 10.8 miles of the East Social Circle - East Watkinsville 230kV line from 1033 ACSR Curlew conductor to 1033 ACCR 200C conductor. TEAMS 19992 · plan p.163 · zone 212 |
GTC | In the plan p.13 |
Jun 1, 2028 | No change | Bostwick, East Social Circle, East Watkinsville |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.