Substation Scout

Bostwick

Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035), in Morgan County.

Morgancounty
230kV in the quote
GTCproject sponsor
2projects in the plan

Described as new. The quoted wording describes building this substation, without the word "new". “Construct the Bostwick 230kV switching station” — TEAMS 09662, plan p.130

County: “Bostwick 230 kV Switching Station (Morgan County)” — Georgia Transmission, East Central Reliability Projects page, retrieved 2026-11-20. The plan itself prints no county column.

Location

33.7706, -83.5101 · Morgan County, GA · view on a map

Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±100 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Symbol anchored: the drawn switching-station footprint (grey stippled rectangle labelled "Proposed Bostwick 230 kV Switching Station") on the EA's Figure 3.0 site plan. Rendered at 220 dpi (~1.0 m/px by its 1,000 ft scale bar). Fitted on two towers drawn on the existing East Social Circle - East Watkinsville 230 kV line (white squares) matched to the vertices of the OSM 230 kV line (way 171540531) at 33.76776,-83.50927 and 33.76998,-83.50419: the drawn spacing (533 px) matches OSM (530 m) and the bearing agrees, so the plan is north-up at the scale bar. Point is the footprint centre, north of High Shoals Road. ±100 m.

Sources: 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.130 · Environmental Assessment: East Central Georgia Reliability Projects (USDA Rural Utilities Service for Georgia Transmission; re-published by DOE as DOE/EA-2313), Bostwick site plan (April 2025 (DOE re-publication March 2026)), p.7-8, Figure 3.0 · Georgia Transmission, East Central Reliability Projects page (with project map east_walton_handout_w_tl_labels.png and mailer map All_Proj_Mailout.png) (n/a (retrieved 2026-11-20)), project descriptions; maps · OpenStreetMap: East Social Circle - East Watkinsville 230 kV line (way 171540531) and High Shoals Road (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
GTC: EAST WALTON 500/230kV PROJECT
GTC: - Construct the East Walton 500/230kV substation - Construct the Bostwick 230kV switching station - Construct the East Walton - Rockville 500kV line - Construct the Bethabara - East Walton 230kV line - Construct the Bostwick - East Walton 230kV line - Construct the East Walton - Jack's Creek 230kV line - At Bethabara, terminate the East Walton 230kV line - Loop the East Social Circle - East Watkinsville 230kV li…
TEAMS 09662 · plan p.130 · zone 212
GTC In the plan
p.10
Jun 1, 2027 No change Bethabara, Bostwick, Doyle, East Social Circle, East Walton, East Watkinsville, Jack's Creek, LG&E Monroe, Rockville, Scherer, Warthen
GTC: BOSTWICK - EAST SOCIAL CIRCLE 230kV RECONDUCTOR
Reconductor approximately 10.8 miles of the East Social Circle - East Watkinsville 230kV line from 1033 ACSR Curlew conductor to 1033 ACCR 200C conductor.
TEAMS 19992 · plan p.163 · zone 212
GTC In the plan
p.13
Jun 1, 2028 No change Bostwick, East Social Circle, East Watkinsville

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.