Substation Scout

Putnam, GA interconnection queue

2 active projects totaling 909.1 MW in the Southern Company queue, plus 11 with terminal status (shown grayed).

2active projects
909.1active MW
13total filed
Queue IDProjectkVMWResourceStatus
IC-242 Not reported 230 1,922 Gas Withdrawn
IC-241 Not reported 230 961 Gas Withdrawn
25-IC-1329 Not reported 230 759.1 Gas Active
IC-1190 Not reported 230 200 Solar Withdrawn
IC-1191 Not reported 230 200 Solar Withdrawn
IC-1269 Not reported 230 200 Battery Withdrawn
IC-1240 Not reported 500 175 Solar Withdrawn
IC-374 Not reported 230 151.3 Solar Withdrawn
IC-905 Not reported 230 150 Battery Active
IC-375 Not reported 115 120.7 Solar Withdrawn
IC-1188 Not reported 230 100 Battery Withdrawn
IC-362 Not reported 230 29.7 Solar Withdrawn
IC-373 Not reported 46 19.6 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first