Substation Scout

Bonaire Primary

Named in 5 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
—kV in the quote
GPC, GTC, MEAGproject sponsor
5projects in the plan

The plan prints no county for this substation, and no utility project page found names one for it.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
MEAG: AULTMAN ROAD - BONAIRE PRIMARY 115 kV REBUILD
MEAG: Rebuild the 1.99 miles of Sleepy Hollow - Peach Blossom 115kV line section of the Aultman Road - Bonaire Primary 115kV line with 100C 795 ACSR. GTC: Replace the jumpers at Sleepy Hollow with 1590 AAC.
TEAMS 13787 · plan p.102 · zone 214
MEAG In the plan
p.8
Jun 1, 2026 Delayed from 2025 to 2026 Aultman Road, Bonaire Primary, Peach Blossom, Sleepy Hollow
GTC: BONAIRE PRIMARY - ECHECONNEE 115kV LINE
Rebuild the Bonaire Primary - Echeconnee 115kV line, approximately 19 miles with 200C 1351 ACSS conductor.
TEAMS 19610 · plan p.276 · zone 214
GTC In the plan
p.20
Jun 1, 2031 New project Bonaire Primary, Echeconnee
BONAIRE PRIMARY - KATHLEEN 230kV LINE REBUILD
Rebuild the Bonaire Primary - Kathleen 230kV line (approximately 6 miles) with 200C 1351 ACSS conductor. Upgrade limiting elements at substation along the Kathleen - Pitts 230kV line.
TEAMS 20512 · plan p.89 · zone 214
GPC In the plan
p.7
Jun 1, 2026 No change Bonaire Primary, Kathleen, Pitts
GTC: BONAIRE PRIMARY - EASTMAN PRIMARY 115kV LINE REBUILD
Rebuild 41.08 miles of the Bonaire Primary - Eastman Primary 115kV Line with 200C 1351 ACSS Martin conductor and upgrade the limiting bus with a higher rating.
TEAMS 21140 · plan p.244 · zone 214
GTC In the plan
p.18
Jun 1, 2030 Delayed from 2029 to 2030 Bonaire Primary, Eastman Primary
CC - DEER CREEK 500/230kV SOLUTION (NETWORK IMPROVEMENTS)
Build a 500/230kV station (Deer Creek) splitting the Bonaire Primary - Scherer 500kV line. Install two 500/230kV auto transformers and build 2 bundled 200C 1351 ACSS Martin 230kV lines from Deer Creek to Little Deer Creek.
TEAMS 21419 · plan p.156 · zone 214
GPC In the plan
p.12
Jun 1, 2028 New project Bonaire Primary, Deer Creek, Scherer

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first