Echeconnee
Named in 4 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).
—county (not printed)
—kV in the quote
GPC, GTCproject sponsor
4projects in the plan
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| GTC: BONAIRE PRIMARY - ECHECONNEE 115kV LINE Rebuild the Bonaire Primary - Echeconnee 115kV line, approximately 19 miles with 200C 1351 ACSS conductor. TEAMS 19610 · plan p.276 · zone 214 |
GTC | In the plan p.20 |
Jun 1, 2031 | New project | Bonaire Primary, Echeconnee |
| ECHECONNEE-WELLSTON 115kV Rebuild approximately 1.5 miles of the North Warner Robins - South Warner Robins segment of the Echeconnee - Wellston 115kV line with 200C 1351 ACSS conductor and the limiting elements along the line with higher ratings. Replace the Bus and jumper at North Warner Robins with higher rated equipment. TEAMS 19627 · plan p.241 · zone 214 |
GPC | In the plan p.18 |
Jun 1, 2030 | No change | Echeconnee, Wellston |
| BROADWAY - ECHECONNEE 115kV LINE RECONDUCTOR Reconductor the 4.9 miles Griffin Rd to Echeconnee segment of the Broadway - Echeconnee 115kV line with 210C 636 ACCR conductor. Replace the limiting jumper with higher rated jumper. TEAMS 21047 · plan p.119 · zone 214 |
GPC | In the plan p.10 |
Jun 1, 2027 | Advanced from 2029 to 2027 | Broadway, Echeconnee |
| BROADWAY - ECHECONNEE 115kV REBUILD Rebuild the Griffin Rd to Broadway section of the Broadway - Echeconnee 115kV line, approximately 11.5 miles, with 200C 1351 ACSS conductor. TEAMS 21625 · plan p.232 · zone 214 |
GPC | In the plan p.17 |
Jun 1, 2030 | New project | Broadway, Echeconnee |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.