Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
500, 230kV in the quote
GPCproject sponsor
1projects in the plan

Described as new. The quoted wording describes building this substation, without the word "new". “Build a 500/230kV station (Deer Creek)” — TEAMS 21419, plan p.156

The plan prints no county for this substation, and no utility project page found names one for it.

Location

On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

Sources: 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.156 · SERTP 2025 Regional Transmission Plan, SOUTHERN Balancing Authority Area project list (2025), p.98 · SERTP Q4 2025 annual transmission planning summit, SOUTHERN BAA project slides (2025-12), slide p.86 · OpenStreetMap: Bonaire Primary and Scherer substations; Bonaire - Scherer 500kV line (way 9424299) (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
CC - DEER CREEK 500/230kV SOLUTION (NETWORK IMPROVEMENTS)
Build a 500/230kV station (Deer Creek) splitting the Bonaire Primary - Scherer 500kV line. Install two 500/230kV auto transformers and build 2 bundled 200C 1351 ACSS Martin 230kV lines from Deer Creek to Little Deer Creek.
TEAMS 21419 · plan p.156 · zone 214
GPC In the plan
p.12
Jun 1, 2028 New project Bonaire Primary, Deer Creek, Scherer

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.