Williamson County: substations in ERCOT transmission project tracking
35 substation names the workbook places in Williamson County.
| Substation | Projects | Utilities | kV | HIFLD record |
|---|---|---|---|---|
| Andice | 2 | LCRATSC, PEC | 138 | None |
| Bent Tree Substation | 1 | ONCOR | 138 | None |
| Berry Creek | 1 | LCRATSC | 138 | None |
| Chief Brady | 1 | LCRATSC | 138 | Name and county agree |
| Elgin | 2 | LCRATSC | 138 | Name and county agree |
| Gabriel | 8 | BEPC, LCRATSC | 138, 345 | Name and county agree |
| Georgetown | 2 | LCRATSC | 138 | Name and county agree |
| Georgetown East | 2 | ONCOR | 138 | None |
| Glasscock | 1 | LCRATSC | 138 | Name and county agree |
| Holland | 1 | ONCOR | 69 | None |
| Hutto | 10 | LCRATSC, ONCOR | 138, 345 | None |
| Jarrell | 1 | LCRATSC | 138 | Name and county agree |
| Limmer | 2 | LCRATSC | 345 | None |
| Limmer (LCRA TSC) | 1 | ONCOR | 345 | None |
| Limmer (LCRA) | 1 | LCRATSC | 345 | None |
| Merrilltown | 0 | AEN | 138 | None |
| Midnight | 1 | ONCOR | 138 | None |
| Muscovy | 3 | ONCOR | 345 | None |
| Muscovy (ONCOR) | 1 | LCRATSC | 345 | None |
| Pintail | 1 | ONCOR | 138 | None |
| Rivery | 1 | LCRATSC | 138 | None |
| Round Rock Northeast | 1 | ONCOR | 138 | Name and county agree |
| Round Rock Switch | 1 | ONCOR | 138 | Name and county agree |
| Round Rock Westinghouse Tap | 1 | ONCOR | 138 | None |
| Salado | 2 | LCRATSC, ONCOR | 138, 345 | None |
| Schwertner | 1 | BEPC | 138 | None |
| Skybox | 2 | ONCOR | 138 | None |
| Sonterra | 2 | ONCOR | 138 | Name and county agree |
| Structure 21 | 1 | LCRATSC | 138 | None |
| T224 Gabriel | 1 | LCRATSC | 138 | None |
| Taylor | 1 | ONCOR | 69 | Name and county agree |
| Teal | 6 | ONCOR | 138, 345 | None |
| Wilke | 1 | ONCOR | 138 | None |
| Windy Ridge | 1 | ONCOR | 138 | None |
| Zorn | 1 | LCRATSC | 345 | None |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.