Hutto
Named in 10 listed projects in ERCOT’s transmission project tracking workbook, in Williamson County. First named in the release with data as of February 1, 2015.
Williamsoncounty as printed
138, 345kV
LCRATSC, ONCORutility
10projects listed
Also printed as: Hutto Switch
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Williamson, TX: ERCOT queue, 1 active of 3. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Hutto - Limmer Transmission Line Upgrade This project will install the Hutto - Limmer 345-kV transmission line on separate structures to remove an ERCOT double-circuit contingency event. This project will require coordination with Oncor. The need for this project with identified by ERCOT in the EIR for RPG 25RPG009. ERCOT project 109792 · utility no. PLC-8544 · RPG 25RPG009 |
LCRATSC Tier 4 |
Planned Future tab |
345 | Feb 2030 | Hutto to Limmer Williamson County |
Hutto, Limmer |
| Install 138 kV Capacitor Bank at Hutto 138 kV Switch ERCOT project 110014 · utility no. R6534 |
ONCOR Tier 4 |
Planned Future tab |
138 | May 2028 | Hutto to Hutto Williamson County |
Hutto |
| Rebuild the Hutto - Gilleland Creek 138 kV DCKT Line ERCOT project 110024 · utility no. R6521 |
ONCOR Tier 3 |
Planned Future tab |
138 | May 2029 | Hutto to Gilleland Creek (LCRA TSC) Williamson / Travis County |
Hutto, Gilleland Creek (LCRA TSC) |
| Rebuild Hutto - Round Rock Northeast 138 kV DCKT Line Section ERCOT project 110044 · utility no. R6553 |
ONCOR Tier 1 |
Planned Future tab |
138 | Dec 2029 | Hutto to Round Rock Northeast Williamson County |
Hutto, Round Rock Northeast |
| LCRATSC Gabriel Hutto Transmission Line Addition This project will construct a new 345-kV double-circuit transmission line between Gabriel and Oncor Hutto substations. The need for this project with identified by ERCOT in the EIR for RPG 25RPG009. ERCOT project 110120 · RPG 25RPG009 |
LCRATSC Tier 1 |
Planned Future tab |
345 | Dec 2031 | Gabriel to Hutto Williamson County |
Gabriel, Hutto |
| LCP Hutto - Limmer Transmission Line Upgrade Upgrade 345 kV DCKT line from Hutto to Limmer for a minimum of 1989 MVA rating. Project part of LCP effort for Batch Zero Base Load ERCOT project 110266 |
LCRATSC Tier 4 |
Conceptual Future tab |
345 | Dec 2030 | Hutto to Limmer Williamson County |
Hutto, Limmer |
| Rebuild Hutto Switch - Salado Switch 345 kV DKCT Line ERCOT project 110344 · utility no. R6529 |
ONCOR Tier 3 |
Conceptual Future tab |
345 | May 2033 | Hutto Switch to Salado Switch Williamson / Bell County |
Hutto Switch, Salado Switch |
| Limmer Substation Addition Construct a new LCRA TSC-owned Limmer Substation in the Hutto to Zorn 345 kV line approximately 3 miles east of Hutto. Limmer Substation will be installed initially as a five-breaker 345 kV breaker-and-a-half arrangement. ERCOT project 69345 · RPG 22RPG027 |
LCRATSC Tier 3 |
Planned Completed tab |
345 | May 2025 actual 2025-05 |
Zorn, Hutto to Limmer Williamson / Travis County |
Zorn, Hutto, Limmer |
| Upgrade the Hutto & Round Rock - Salado 138 kV Line Increase the maximum operating temperature of the Hutto - Round Rock 138 kV Line and rebuild the Round Rock Westinghouse Tap - Round Rock Westinghouse 138 kV Line Section ERCOT project 80546A · utility no. R6203, R6202 · RPG 24RPG018, 25RPG006 · RTP 2023-SC17 |
ONCOR Tier 3 |
In-Service Completed tab |
138 | Dec 2025 actual 2026-01 |
Hutto Switch to Round Rock Switch Williamson County |
Hutto Switch, Round Rock Switch |
| Upgrade Hutto 138 kV terminal equipment Upgrade Hutto 138 kV terminal equipment for the Hutto - Teal 138 kV Line ERCOT project 99271 · utility no. R6205 |
ONCOR Tier 4 |
Planned Future tab |
138 | Dec 2027 | Hutto to Hutto Williamson County |
Hutto |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109792 | First listed | on the Future tab |
| July 13, 2026 | 110014 | First listed | on the Future tab |
| July 13, 2026 | 110024 | First listed | on the Future tab |
| July 13, 2026 | 110044 | First listed | on the Future tab |
| July 13, 2026 | 110120 | First listed | on the Future tab |
| July 13, 2026 | 110266 | First listed | on the Future tab |
| July 13, 2026 | 110344 | First listed | on the Future tab |
| June 1, 2026 | 99271 | Projected in-service date | May 2027 → Dec 2027 |
| February 1, 2026 | 80546A | Moved between tabs | Current-year planned → Completed |
| February 1, 2026 | 80546A | Status as reported | Planned → In-Service |
| October 1, 2025 | 69345 | Moved between tabs | Current-year planned → Completed |
| October 1, 2025 | 69345 | Projected in-service date | Dec 2025 → May 2025 |
| October 1, 2025 | 99271 | First listed | on the Future tab |
| June 1, 2025 | 69345 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 80546A | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 80546A | Projected in-service date | May 2025 → Dec 2025 |
| February 1, 2025 | 69345 | Projected in-service date | May 2025 → Dec 2025 |
| June 1, 2024 | 80546A | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.