Hutto

Named in 10 listed projects in ERCOT’s transmission project tracking workbook, in Williamson County. First named in the release with data as of February 1, 2015.

Williamsoncounty as printed
138, 345kV
LCRATSC, ONCORutility
10projects listed

Also printed as: Hutto Switch

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Williamson, TX: ERCOT queue, 1 active of 3. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Hutto - Limmer Transmission Line Upgrade
This project will install the Hutto - Limmer 345-kV transmission line on separate structures to remove an ERCOT double-circuit contingency event. This project will require coordination with Oncor. The need for this project with identified by ERCOT in the EIR for RPG 25RPG009.
ERCOT project 109792 · utility no. PLC-8544 · RPG 25RPG009
LCRATSC
Tier 4
Planned
Future tab
345 Feb 2030 Hutto to Limmer
Williamson County
Hutto, Limmer
Install 138 kV Capacitor Bank at Hutto 138 kV Switch
ERCOT project 110014 · utility no. R6534
ONCOR
Tier 4
Planned
Future tab
138 May 2028 Hutto to Hutto
Williamson County
Hutto
Rebuild the Hutto - Gilleland Creek 138 kV DCKT Line
ERCOT project 110024 · utility no. R6521
ONCOR
Tier 3
Planned
Future tab
138 May 2029 Hutto to Gilleland Creek (LCRA TSC)
Williamson / Travis County
Hutto, Gilleland Creek (LCRA TSC)
Rebuild Hutto - Round Rock Northeast 138 kV DCKT Line Section
ERCOT project 110044 · utility no. R6553
ONCOR
Tier 1
Planned
Future tab
138 Dec 2029 Hutto to Round Rock Northeast
Williamson County
Hutto, Round Rock Northeast
LCRATSC Gabriel Hutto Transmission Line Addition
This project will construct a new 345-kV double-circuit transmission line between Gabriel and Oncor Hutto substations. The need for this project with identified by ERCOT in the EIR for RPG 25RPG009.
ERCOT project 110120 · RPG 25RPG009
LCRATSC
Tier 1
Planned
Future tab
345 Dec 2031 Gabriel to Hutto
Williamson County
Gabriel, Hutto
LCP Hutto - Limmer Transmission Line Upgrade
Upgrade 345 kV DCKT line from Hutto to Limmer for a minimum of 1989 MVA rating. Project part of LCP effort for Batch Zero Base Load
ERCOT project 110266
LCRATSC
Tier 4
Conceptual
Future tab
345 Dec 2030 Hutto to Limmer
Williamson County
Hutto, Limmer
Rebuild Hutto Switch - Salado Switch 345 kV DKCT Line
ERCOT project 110344 · utility no. R6529
ONCOR
Tier 3
Conceptual
Future tab
345 May 2033 Hutto Switch to Salado Switch
Williamson / Bell County
Hutto Switch, Salado Switch
Limmer Substation Addition
Construct a new LCRA TSC-owned Limmer Substation in the Hutto to Zorn 345 kV line approximately 3 miles east of Hutto. Limmer Substation will be installed initially as a five-breaker 345 kV breaker-and-a-half arrangement.
ERCOT project 69345 · RPG 22RPG027
LCRATSC
Tier 3
Planned
Completed tab
345 May 2025
actual 2025-05
Zorn, Hutto to Limmer
Williamson / Travis County
Zorn, Hutto, Limmer
Upgrade the Hutto & Round Rock - Salado 138 kV Line
Increase the maximum operating temperature of the Hutto - Round Rock 138 kV Line and rebuild the Round Rock Westinghouse Tap - Round Rock Westinghouse 138 kV Line Section
ERCOT project 80546A · utility no. R6203, R6202 · RPG 24RPG018, 25RPG006 · RTP 2023-SC17
ONCOR
Tier 3
In-Service
Completed tab
138 Dec 2025
actual 2026-01
Hutto Switch to Round Rock Switch
Williamson County
Hutto Switch, Round Rock Switch
Upgrade Hutto 138 kV terminal equipment
Upgrade Hutto 138 kV terminal equipment for the Hutto - Teal 138 kV Line
ERCOT project 99271 · utility no. R6205
ONCOR
Tier 4
Planned
Future tab
138 Dec 2027 Hutto to Hutto
Williamson County
Hutto

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026109792First listedon the Future tab
July 13, 2026110014First listedon the Future tab
July 13, 2026110024First listedon the Future tab
July 13, 2026110044First listedon the Future tab
July 13, 2026110120First listedon the Future tab
July 13, 2026110266First listedon the Future tab
July 13, 2026110344First listedon the Future tab
June 1, 202699271Projected in-service dateMay 2027 → Dec 2027
February 1, 202680546AMoved between tabsCurrent-year planned → Completed
February 1, 202680546AStatus as reportedPlanned → In-Service
October 1, 202569345Moved between tabsCurrent-year planned → Completed
October 1, 202569345Projected in-service dateDec 2025 → May 2025
October 1, 202599271First listedon the Future tab
June 1, 202569345Moved between tabsFuture → Current-year planned
June 1, 202580546AMoved between tabsFuture → Current-year planned
June 1, 202580546AProjected in-service dateMay 2025 → Dec 2025
February 1, 202569345Projected in-service dateMay 2025 → Dec 2025
June 1, 202480546AFirst listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.