Reeves County: substations in ERCOT transmission project tracking
31 substation names the workbook places in Reeves County.
| Substation | Projects | Utilities | kV | HIFLD record |
|---|---|---|---|---|
| Bottlebrush | 1 | AEP TNC/TNMP | 345 | None |
| Bracero Pecan | 1 | AEP TNC | 138 | None |
| Collier | 0 | AEP TNC | 138 | None |
| Cottonwood | 1 | TNMP | 138 | None |
| Cowpen | 1 | TNMP | 138 | None |
| Coyanosa | 1 | TNMP | 138 | None |
| Creosote | 2 | AEP TNC, AEP TNC/ONCOR | 345 | None |
| Cryo | 2 | AEP TNC/TNMP, TNMP | 138 | None |
| Culberson | 1 | ONCOR | 138 | None |
| Dry Lake | 1 | ONCOR | 345 | None |
| Dry Lake (ONCOR) | 2 | ONCOR | 138, 345 | None |
| Faulkner | 4 | AEP TNC/TNMP, TNMP | 138, 345 | None |
| Faulkner (TNMP) | 2 | ONCOR | 138, 345 | None |
| Gas Pad Tap | 1 | AEP TNC | 138 | None |
| Hoefs Road Station | 1 | AEP TNC | 69 | None |
| Lean Clay | 1 | TNMP | 138 | None |
| Musquiz | 1 | AEP TNC | 138 | None |
| Origin | 0 | AEP TNC | 138 | None |
| Pecos | 1 | TNMP | 138 | Name and county agree |
| Pig Creek | 1 | AEP TNC | 138 | None |
| Riverton | 2 | ONCOR | 138, 345 | None |
| Sand Lake | 2 | AEP TNC, ONCOR | 138, 765 | None |
| Sandlake | 1 | ONCOR | 345 | None |
| Saragosa | 3 | AEP TNC | 138 | Name and county agree |
| Scissortail | 1 | AEP TNC | 138 | None |
| Sunflower | 1 | AEP TNC | 138 | None |
| Switchgrass | 0 | TNMP | 138 | None |
| Taurus | 1 | AEP TNC | 345 | None |
| Toyah Creek | 1 | AEP TNC/ONCOR | 345 | None |
| Vanhagar | 0 | AEP TNC | 138 | None |
| Verhalen | 0 | AEP TNC | 138 | None |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.