Sunflower

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Reeves County. First named in the release with data as of June 1, 2026.

Reevescounty as printed
138kV
AEP TNCutility
1projects listed

Described as new. The quoted wording calls this substation new. “Sunflower: Construct New 138 kV Station” — project 104030 title, as the utility reported it

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Reeves, TX: ERCOT queue, 24 active of 27. Same county, not the same substation.

Location

Reeves County, TX

On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: No point. TPIT places the station on the Scissortail to Solstice 138 kV (the former Saragosa - Solstice line) line; TPIT narrows it to the section between Hoefs Road (OpenStreetMap AEP Hoefs Road Substation, way 503430192, 31.0318,-103.4584) and Scissortail (a new station, not located). The station is somewhere on that line; no public document found that draws or describes its site.

Sources: ERCOT TPIT, project(s) 104030 (release 39, 2026-10-01) · OpenStreetMap: Hoefs Road Substation (way 503430192) (OSM extract 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Sunflower: Construct New 138 kV Station
Interconnect August Draw Solar to the new Sunflower 138 kV station on the Scissortail to Solstice 138 kV line between Hoefs Road and Scissortail
ERCOT project 104030 · utility no. TP2025812
AEP TNC
Tier 4
Planned
Future tab
138 Apr 2028 Sunflower
Reeves County
Sunflower

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
June 1, 2026104030First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.