Riverton
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Reeves County. First named in the release with data as of February 1, 2016.
Reevescounty as printed
138, 345kV
ONCORutility
2projects listed
Also printed as: Riverton Switch
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Reeves, TX: ERCOT queue, 24 active of 27. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Riverton-Border-Quarry Field 138 kV Second Circuit Add Permian Basin Reliability Plan Upgrade ID L1A and L1D Riverton-Border-Quarry Field 138 kV Second Circuit ERCOT project 81060 · utility no. R8733 |
ONCOR Tier 4 |
In-Service Completed tab |
138 | Dec 2025 actual 2025-12 |
Riverton to Quarry Field Reeves / Loving County |
Riverton, Quarry Field |
| Construct Drill Hole – Riverton 345 kV Double-Circuit ERCOT project 87021 · utility no. R8748 · RPG 24RPG010 |
ONCOR Tier 1 |
Planned Future tab |
345 | Dec 2027 | Drill Hole Switch to Riverton Switch Culberson / Reeves County |
Drill Hole Switch, Riverton Switch |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| February 1, 2026 | 81060 | Moved between tabs | Current-year planned → Completed |
| February 1, 2026 | 81060 | Status as reported | Planned → In-Service |
| June 1, 2025 | 81060 | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 87021 | Projected in-service date | Dec 2026 → Dec 2027 |
| October 1, 2024 | 87021 | First listed | on the Future tab |
| June 1, 2024 | 81060 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.