Substation Scout

TH Wharton

Named in 7 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.

Harriscounty as printed
138, 345kV
CNPutility
7projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Fairbanks (FB) Substation Expansion
Expand existing 138kV Fairbanks substation with in-series breakers.
ERCOT project 102779
CNP
Tier 4
Planned
Future tab
138 Dec 2027 Fairbanks to TH Wharton/Deihl
Harris County
Fairbanks, TH Wharton, Deihl
This models upgrades related to the Willow Phase 3 Load addition
Build a new 138 kV circuit between Tomball and T.H. Wharton using the open circuit position on the existing double circuit towers. Loop the new circuit into Willow substation creating TH Wharton to Willow to Tomball.
ERCOT project 109769A · RPG 26RPG023
CNP
Tier 3
Conceptual
Future tab
138 Jun 2028 Willow to Tomball/TH Wharton
Harris County
Willow, Tomball, TH Wharton
This models upgrades related to the Willow Phase 3 Load addition
Disconnect Willow substation from existing ckt.81 leaving a T.H. Wharton to Klein ckt.81.
ERCOT project 109769B · RPG 26RPG023
CNP
Tier 3
Conceptual
Future tab
138 Jun 2028 TH Wharton to Klein
Harris County
TH Wharton, Klein
New 345kV Mission (MSS) substation for generator interconnection to Parliament Solar.
Upgrade Ckt.71C TH Wharton to Zenith in order to increase thermal limits
ERCOT project 69902B
CNP
Tier 4
Planned
Future tab
345 Jan 2027 TH Wharton to Zenith
Harris County
TH Wharton, Zenith
NRG THW GT at TH Wharton 345kV (24INR0482)
Install NRG THW GT at TH Wharton 345kV substation. Connect at the same generator lead as 05THWGEN
ERCOT project 90157
CNP
Tier 4
In-Service
Completed tab
345 Mar 2026
actual 2026-04
TH Wharton
Harris County
TH Wharton
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.97A North Belt to TH Wharton to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453D
CNP
Tier 4
In-Service
Completed tab
345 May 2026
actual 2026-02
North Belt to TH Wharton
Harris County
North Belt, TH Wharton
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.98I Zenith to TH Wharton to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453U
CNP
Tier 4
Planned
Future tab
345 May 2027 Zenith to TH Wharton
Harris County
Zenith, TH Wharton

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026109769AFirst listedon the Future tab
July 13, 2026109769BFirst listedon the Future tab
June 1, 2026102779Projected in-service dateMay 2027 → Dec 2027
June 1, 202690157Moved between tabsCurrent-year planned → Completed
June 1, 202690157Status as reportedPlanned → In-Service
June 1, 202690157Projected in-service dateJan 2026 → Mar 2026
June 1, 202699453DMoved between tabsCurrent-year planned → Completed
June 1, 202699453DStatus as reportedPlanned → In-Service
February 1, 2026102779First listedon the Future tab
February 1, 202690157Projected in-service dateOct 2025 → Jan 2026
February 1, 202699453DMoved between tabsFuture → Current-year planned
February 1, 202699453UProjected in-service dateMay 2026 → May 2027
October 1, 202569902BMoved between tabsCompleted → Future
October 1, 202569902BProjected in-service dateFeb 2025 → Jan 2027
October 1, 202599453DFirst listedon the Future tab
October 1, 202599453UFirst listedon the Future tab
June 1, 202569902BMoved between tabsFuture → Completed
June 1, 202590157Moved between tabsFuture → Current-year planned
February 1, 202569902BProjected in-service dateJan 2025 → Feb 2025
February 1, 202590157First listedon the Future tab
October 1, 202469902BProjected in-service dateOct 2024 → Jan 2025

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.

Before relying on any of this