TH Wharton
Named in 7 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.
Harriscounty as printed
138, 345kV
CNPutility
7projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Fairbanks (FB) Substation Expansion Expand existing 138kV Fairbanks substation with in-series breakers. ERCOT project 102779 |
CNP Tier 4 |
Planned Future tab |
138 | Dec 2027 | Fairbanks to TH Wharton/Deihl Harris County |
Fairbanks, TH Wharton, Deihl |
| This models upgrades related to the Willow Phase 3 Load addition Build a new 138 kV circuit between Tomball and T.H. Wharton using the open circuit position on the existing double circuit towers. Loop the new circuit into Willow substation creating TH Wharton to Willow to Tomball. ERCOT project 109769A · RPG 26RPG023 |
CNP Tier 3 |
Conceptual Future tab |
138 | Jun 2028 | Willow to Tomball/TH Wharton Harris County |
Willow, Tomball, TH Wharton |
| This models upgrades related to the Willow Phase 3 Load addition Disconnect Willow substation from existing ckt.81 leaving a T.H. Wharton to Klein ckt.81. ERCOT project 109769B · RPG 26RPG023 |
CNP Tier 3 |
Conceptual Future tab |
138 | Jun 2028 | TH Wharton to Klein Harris County |
TH Wharton, Klein |
| New 345kV Mission (MSS) substation for generator interconnection to Parliament Solar. Upgrade Ckt.71C TH Wharton to Zenith in order to increase thermal limits ERCOT project 69902B |
CNP Tier 4 |
Planned Future tab |
345 | Jan 2027 | TH Wharton to Zenith Harris County |
TH Wharton, Zenith |
| NRG THW GT at TH Wharton 345kV (24INR0482) Install NRG THW GT at TH Wharton 345kV substation. Connect at the same generator lead as 05THWGEN ERCOT project 90157 |
CNP Tier 4 |
In-Service Completed tab |
345 | Mar 2026 actual 2026-04 |
TH Wharton Harris County |
TH Wharton |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.97A North Belt to TH Wharton to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453D |
CNP Tier 4 |
In-Service Completed tab |
345 | May 2026 actual 2026-02 |
North Belt to TH Wharton Harris County |
North Belt, TH Wharton |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.98I Zenith to TH Wharton to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453U |
CNP Tier 4 |
Planned Future tab |
345 | May 2027 | Zenith to TH Wharton Harris County |
Zenith, TH Wharton |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109769A | First listed | on the Future tab |
| July 13, 2026 | 109769B | First listed | on the Future tab |
| June 1, 2026 | 102779 | Projected in-service date | May 2027 → Dec 2027 |
| June 1, 2026 | 90157 | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 90157 | Status as reported | Planned → In-Service |
| June 1, 2026 | 90157 | Projected in-service date | Jan 2026 → Mar 2026 |
| June 1, 2026 | 99453D | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 99453D | Status as reported | Planned → In-Service |
| February 1, 2026 | 102779 | First listed | on the Future tab |
| February 1, 2026 | 90157 | Projected in-service date | Oct 2025 → Jan 2026 |
| February 1, 2026 | 99453D | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 99453U | Projected in-service date | May 2026 → May 2027 |
| October 1, 2025 | 69902B | Moved between tabs | Completed → Future |
| October 1, 2025 | 69902B | Projected in-service date | Feb 2025 → Jan 2027 |
| October 1, 2025 | 99453D | First listed | on the Future tab |
| October 1, 2025 | 99453U | First listed | on the Future tab |
| June 1, 2025 | 69902B | Moved between tabs | Future → Completed |
| June 1, 2025 | 90157 | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 69902B | Projected in-service date | Jan 2025 → Feb 2025 |
| February 1, 2025 | 90157 | First listed | on the Future tab |
| October 1, 2024 | 69902B | Projected in-service date | Oct 2024 → Jan 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.