Willow

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of October 1, 2025.

Harriscounty as printed
138kV
CNPutility
3projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
This models upgrades related to the Willow Phase 3 Load addition
Build a new 138 kV circuit between Tomball and T.H. Wharton using the open circuit position on the existing double circuit towers. Loop the new circuit into Willow substation creating TH Wharton to Willow to Tomball.
ERCOT project 109769A · RPG 26RPG023
CNP
Tier 3
Conceptual
Future tab
138 Jun 2028 Willow to Tomball/TH Wharton
Harris County
Willow, Tomball, TH Wharton
Install (1) 60 MVAr switchable cap bank at Willow substation. Connect CB1 at the Willow breaker position with Willow TR3 distribution transformer
ERCOT project 91747
CNP
Tier 4
Planned
Future tab
138 Apr 2028 Willow
Harris County
Willow
Willow Substation Load Addition Upgrades
Install (1) 60 MVAr switchable cap bank at Willow substation.
ERCOT project 93461A
CNP
Tier 4
Planned
Future tab
138 Apr 2028 Willow
Harris County
Willow

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026109769AFirst listedon the Future tab
October 1, 202591747First listedon the Future tab
October 1, 202593461AFirst listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.