Klein
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of October 1, 2025.
A HIFLD substation record has the same name and county: KLEIN (HARRIS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| This models upgrades related to the Willow Phase 3 Load addition Disconnect Willow substation from existing ckt.81 leaving a T.H. Wharton to Klein ckt.81. ERCOT project 109769B · RPG 26RPG023 |
CNP Tier 3 |
Conceptual Future tab |
138 | Jun 2028 | TH Wharton to Klein Harris County |
TH Wharton, Klein |
| Willow Substation Load Addition Upgrades Install (1) 60 MVAr cap bank at Klein substation. Tap the cap bank on Ckt.81F Klein to Kluge. ERCOT project 93461B |
CNP Tier 4 |
Planned Future tab |
138 | Apr 2028 | Klein Harris County |
Klein |
| Willow Substation Load Addition Upgrades Install (3) 14.4 MVAr switchable cap banks at Klein substation. Connect cap banks at the 35kV distribution level. ERCOT project 93461C |
CNP Tier 4 |
Planned Future tab |
138 | Apr 2028 | Klein Harris County |
Klein |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109769B | First listed | on the Future tab |
| October 1, 2025 | 93461B | First listed | on the Future tab |
| October 1, 2025 | 93461C | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.