Zenith
Named in 9 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.
Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand Zenith substation” — project 75938, as the utility reported it
A HIFLD substation record has the same name and county: ZENITH (HARRIS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Aquila (AQU) CEHE-Owned 345kV Substation for TALON (TAL) / Eagle Claw Energy Storage (27INR0085) Install new 345kV Aquila (AQU) substation for generator interconnection to TALON (TAL) / Eagle Claw Energy Storage (27INR0085). Loop Ckt.99D Singleton to Zenith to create new Ckt.99 Singleton to Aquila to Zenith. ERCOT project 102771A |
CNP Tier 4 |
Planned Future tab |
345 | Oct 2029 | Aquila to Zenith / Singleton Grimes / Harris County |
Aquila, Zenith, Singleton |
| This models upgrades required for a proposed load addition Install one 300 MVAR capacitor bank at 345 kV Zenith substation. ERCOT project 110057C |
CNP Tier 4 |
Conceptual Future tab |
345 | Jul 2030 | Zenith Harris County |
Zenith |
| This models upgrades required for a proposed load addition. Install 300 MVAR capacitor bank at the 345 kV Zenith substation. ERCOT project 110077D |
CNP Tier 4 |
Conceptual Future tab |
345 | Jul 2028 | Zenith Harris County |
Zenith |
| This models upgrades required for a proposed load addition. Install second 300 MVAR capacitor bank at the 345 kV Zenith substation. ERCOT project 110077E |
CNP Tier 4 |
Conceptual Future tab |
345 | Jul 2030 | Zenith Harris County |
Zenith |
| This models upgrades required for a proposed load addition Install new 345 kV CEHE-owned sub. Loop on 345 kV Zenith to Gibbons Creek Ckt.18 & 50 ERCOT project 110086A |
CNP Tier 4 |
Conceptual Future tab |
345 | Jul 2028 | Becker to Zenith/Gibbons Creek Harris County |
Becker, Zenith, Gibbons Creek |
| This models upgrades required for a proposed load addition Install new customer 345 kV sub. Loop into new 345 kV CEHE sub with two leads each 3.6 miles. ERCOT project 110086B |
CNP Tier 4 |
Conceptual Future tab |
345 | Jul 2028 | NEWSUB to Zenith/Gibbons Creek Harris County |
Zenith, Gibbons Creek |
| New 345kV Mission (MSS) substation for generator interconnection to Parliament Solar. Upgrade Ckt.71C TH Wharton to Zenith in order to increase thermal limits ERCOT project 69902B |
CNP Tier 4 |
Planned Future tab |
345 | Jan 2027 | TH Wharton to Zenith Harris County |
TH Wharton, Zenith |
| Expand Zenith substation with addition of 35kV Distribution Facilities. Tap TR1 on Ckt.09J to create new Ckt.09J Zenith to Zenith TR1 tap to Fry Road tap. Tap TR2 on Ckt.76A to create new Ckt.76A Zenith to Zenith TR2 tap to Fry Road tap. ERCOT project 75938 |
CNP Tier 4 |
In-Service Completed tab |
138 | Oct 2025 actual 2025-03 |
Zenith to Fry Road Harris County |
Zenith, Fry Road |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.98I Zenith to TH Wharton to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453U |
CNP Tier 4 |
Planned Future tab |
345 | May 2027 | Zenith to TH Wharton Harris County |
Zenith, TH Wharton |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110057C | First listed | on the Future tab |
| July 13, 2026 | 110077D | First listed | on the Future tab |
| July 13, 2026 | 110077E | First listed | on the Future tab |
| July 13, 2026 | 110086A | First listed | on the Future tab |
| July 13, 2026 | 110086B | First listed | on the Future tab |
| February 1, 2026 | 102771A | First listed | on the Future tab |
| February 1, 2026 | 75938 | Moved between tabs | Current-year planned → Completed |
| February 1, 2026 | 75938 | Status as reported | Planned → In-Service |
| February 1, 2026 | 99453U | Projected in-service date | May 2026 → May 2027 |
| October 1, 2025 | 69902B | Moved between tabs | Completed → Future |
| October 1, 2025 | 69902B | Projected in-service date | Feb 2025 → Jan 2027 |
| October 1, 2025 | 99453U | First listed | on the Future tab |
| June 1, 2025 | 69902B | Moved between tabs | Future → Completed |
| June 1, 2025 | 75938 | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 69902B | Projected in-service date | Jan 2025 → Feb 2025 |
| February 1, 2025 | 75938 | Projected in-service date | May 2025 → Oct 2025 |
| October 1, 2024 | 69902B | Projected in-service date | Oct 2024 → Jan 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.