Zenith

Named in 9 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.

Harriscounty as printed
138, 345kV
CNPutility
9projects listed

Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand Zenith substation” — project 75938, as the utility reported it

A HIFLD substation record has the same name and county: ZENITH (HARRIS County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Aquila (AQU) CEHE-Owned 345kV Substation for TALON (TAL) / Eagle Claw Energy Storage (27INR0085)
Install new 345kV Aquila (AQU) substation for generator interconnection to TALON (TAL) / Eagle Claw Energy Storage (27INR0085). Loop Ckt.99D Singleton to Zenith to create new Ckt.99 Singleton to Aquila to Zenith.
ERCOT project 102771A
CNP
Tier 4
Planned
Future tab
345 Oct 2029 Aquila to Zenith / Singleton
Grimes / Harris County
Aquila, Zenith, Singleton
This models upgrades required for a proposed load addition
Install one 300 MVAR capacitor bank at 345 kV Zenith substation.
ERCOT project 110057C
CNP
Tier 4
Conceptual
Future tab
345 Jul 2030 Zenith
Harris County
Zenith
This models upgrades required for a proposed load addition.
Install 300 MVAR capacitor bank at the 345 kV Zenith substation.
ERCOT project 110077D
CNP
Tier 4
Conceptual
Future tab
345 Jul 2028 Zenith
Harris County
Zenith
This models upgrades required for a proposed load addition.
Install second 300 MVAR capacitor bank at the 345 kV Zenith substation.
ERCOT project 110077E
CNP
Tier 4
Conceptual
Future tab
345 Jul 2030 Zenith
Harris County
Zenith
This models upgrades required for a proposed load addition
Install new 345 kV CEHE-owned sub. Loop on 345 kV Zenith to Gibbons Creek Ckt.18 & 50
ERCOT project 110086A
CNP
Tier 4
Conceptual
Future tab
345 Jul 2028 Becker to Zenith/Gibbons Creek
Harris County
Becker, Zenith, Gibbons Creek
This models upgrades required for a proposed load addition
Install new customer 345 kV sub. Loop into new 345 kV CEHE sub with two leads each 3.6 miles.
ERCOT project 110086B
CNP
Tier 4
Conceptual
Future tab
345 Jul 2028 NEWSUB to Zenith/Gibbons Creek
Harris County
Zenith, Gibbons Creek
New 345kV Mission (MSS) substation for generator interconnection to Parliament Solar.
Upgrade Ckt.71C TH Wharton to Zenith in order to increase thermal limits
ERCOT project 69902B
CNP
Tier 4
Planned
Future tab
345 Jan 2027 TH Wharton to Zenith
Harris County
TH Wharton, Zenith
Expand Zenith substation with addition of 35kV Distribution Facilities. Tap TR1 on Ckt.09J to create new Ckt.09J Zenith to Zenith TR1 tap to Fry Road tap. Tap TR2 on Ckt.76A to create new Ckt.76A Zenith to Zenith TR2 tap to Fry Road tap.
ERCOT project 75938
CNP
Tier 4
In-Service
Completed tab
138 Oct 2025
actual 2025-03
Zenith to Fry Road
Harris County
Zenith, Fry Road
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.98I Zenith to TH Wharton to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453U
CNP
Tier 4
Planned
Future tab
345 May 2027 Zenith to TH Wharton
Harris County
Zenith, TH Wharton

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110057CFirst listedon the Future tab
July 13, 2026110077DFirst listedon the Future tab
July 13, 2026110077EFirst listedon the Future tab
July 13, 2026110086AFirst listedon the Future tab
July 13, 2026110086BFirst listedon the Future tab
February 1, 2026102771AFirst listedon the Future tab
February 1, 202675938Moved between tabsCurrent-year planned → Completed
February 1, 202675938Status as reportedPlanned → In-Service
February 1, 202699453UProjected in-service dateMay 2026 → May 2027
October 1, 202569902BMoved between tabsCompleted → Future
October 1, 202569902BProjected in-service dateFeb 2025 → Jan 2027
October 1, 202599453UFirst listedon the Future tab
June 1, 202569902BMoved between tabsFuture → Completed
June 1, 202575938Moved between tabsFuture → Current-year planned
February 1, 202569902BProjected in-service dateJan 2025 → Feb 2025
February 1, 202575938Projected in-service dateMay 2025 → Oct 2025
October 1, 202469902BProjected in-service dateOct 2024 → Jan 2025

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.