White Oak
Named in 8 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.
A HIFLD substation record has the same name and county: WHITE OAK (HARRIS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Fairbanks Substation 4th Transformer ERCOT project 103878 |
CNP Tier 4 |
Planned Future tab |
138 | Dec 2027 | Deihl to White Oak Harris County |
Deihl, White Oak |
| BP24 Sub Upgrades Upgrade White Oak to Jeanetta Ckt.72B to increase thermal limits ERCOT project 73371H |
CNP Tier 4 |
In-Service Completed tab |
345 | Jan 2025 actual 2025-02 |
White Oak to Jeanetta Harris County |
White Oak, Jeanetta |
| Heights 138kV Loop Conversion Convert Eureka to double-tap service. Tap Ckt.81J to create new Ckt.81J White Oak to Eureka TR1 tap to Wirt. ERCOT project 73578C |
CNP Tier 4 |
In-Service Completed tab |
138 | May 2025 actual 2025-05 |
Wirt to White Oak Harris County |
Wirt, White Oak |
| Heights 138kV Loop Conversion Convert Heights substation to 138kV service. Retire/repurpose portions of 69kV Ckts. 34A/34B for the new Heights 138kV loop. Reconfigure Ckt.09D to create new Ckt.09D Eureka TR2/TR3 tap to HE-DN_TR1 tap to Heights 138kV to White Oak. Reconductor any existing 1-795AAC limiting conductor to 2-959ACSS. Remove existing Heights 7.2 MVAR cap bank from Heights TR1. ERCOT project 73578D |
CNP Tier 4 |
Planned Current-year planned tab |
138 | Oct 2026 | Heights to San Felipe/White Oak Harris County |
Heights, San Felipe, White Oak |
| Heights 138kV Loop Conversion Remove White Oak auto A2/A4 and remaining 69kV facilities ERCOT project 73578E |
CNP Tier 4 |
Planned Current-year planned tab |
138 | Oct 2026 | White Oak Harris County |
White Oak |
| Heights 138kV Loop Conversion Convert Eureka to double-tap service. Tap Ckt.09D to create new Ckt.09D San Felipe to Eureka TR2/TR3 tap to White Oak. Reconductor Ckt.09D Eureka TR2/TR3 tap to White Oak to increase thermal limits. Upgrade San Felipe line relaying Ckt.09D San Felipe to White Oak. ERCOT project 73578K |
CNP Tier 4 |
In-Service Completed tab |
138 | May 2025 actual 2025-05 |
San Felipe to White Oak Harris County |
San Felipe, White Oak |
| Addicks 345kV to White oak Ckt.71B Upgrades Upgrade Ckt.71B Addicks to White Oak to increase thermal limits ERCOT project 87344 |
CNP Tier 4 |
In-Service Completed tab |
345 | Feb 2026 actual 2026-01 |
Addicks to White Oak Harris County |
Addicks, White Oak |
| Install (2) new 100 MVA distribution transformers at Liberty substation to serve customer load. Install (1) new 100 MVA distribution transformer on ckt.03 at Liberty substation to serve customer load. ERCOT project 87637A |
CNP Tier 4 |
Planned Current-year planned tab |
138 | Dec 2026 | Liberty-new distribution tap to White Oak/ Greens Bayou Plant Harris County |
Liberty-new distribution tap, White Oak, Greens Bayou Plant |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 87637A | First listed | on the Current-year planned tab |
| June 1, 2026 | 103878 | First listed | on the Future tab |
| June 1, 2026 | 87344 | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 87344 | Status as reported | Planned → In-Service |
| June 1, 2026 | 87344 | Projected in-service date | Jan 2026 → Feb 2026 |
| February 1, 2026 | 73578D | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 73578D | Projected in-service date | May 2026 → Oct 2026 |
| February 1, 2026 | 73578E | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 73578E | Projected in-service date | May 2026 → Oct 2026 |
| February 1, 2026 | 87344 | Projected in-service date | Dec 2025 → Jan 2026 |
| June 1, 2025 | 73371H | Status as reported | Planned → In-Service |
| June 1, 2025 | 73578C | Moved between tabs | Future → Completed |
| June 1, 2025 | 73578C | Status as reported | Planned → In-Service |
| June 1, 2025 | 73578K | Moved between tabs | Future → Completed |
| June 1, 2025 | 73578K | Status as reported | Planned → In-Service |
| June 1, 2025 | 87344 | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 73371H | Moved between tabs | Future → Completed |
| February 1, 2025 | 73371H | Projected in-service date | Nov 2024 → Jan 2025 |
| February 1, 2025 | 73578K | First listed | on the Future tab |
| February 1, 2025 | 87344 | Projected in-service date | Oct 2026 → Dec 2025 |
| October 1, 2024 | 73371H | Moved between tabs | Completed → Future |
| October 1, 2024 | 73371H | Projected in-service date | May 2024 → Nov 2024 |
| October 1, 2024 | 73578C | Projected in-service date | Dec 2025 → May 2025 |
| October 1, 2024 | 73578D | Projected in-service date | Dec 2025 → May 2026 |
| October 1, 2024 | 73578E | Projected in-service date | Dec 2025 → May 2026 |
| October 1, 2024 | 87344 | First listed | on the Future tab |
| June 1, 2024 | 73371H | Moved between tabs | Future → Completed |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.