Substation Scout

White Oak

Named in 8 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.

Harriscounty as printed
138, 345kV
CNPutility
8projects listed

A HIFLD substation record has the same name and county: WHITE OAK (HARRIS County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Fairbanks Substation 4th Transformer
ERCOT project 103878
CNP
Tier 4
Planned
Future tab
138 Dec 2027 Deihl to White Oak
Harris County
Deihl, White Oak
BP24 Sub Upgrades
Upgrade White Oak to Jeanetta Ckt.72B to increase thermal limits
ERCOT project 73371H
CNP
Tier 4
In-Service
Completed tab
345 Jan 2025
actual 2025-02
White Oak to Jeanetta
Harris County
White Oak, Jeanetta
Heights 138kV Loop Conversion
Convert Eureka to double-tap service. Tap Ckt.81J to create new Ckt.81J White Oak to Eureka TR1 tap to Wirt.
ERCOT project 73578C
CNP
Tier 4
In-Service
Completed tab
138 May 2025
actual 2025-05
Wirt to White Oak
Harris County
Wirt, White Oak
Heights 138kV Loop Conversion
Convert Heights substation to 138kV service. Retire/repurpose portions of 69kV Ckts. 34A/34B for the new Heights 138kV loop. Reconfigure Ckt.09D to create new Ckt.09D Eureka TR2/TR3 tap to HE-DN_TR1 tap to Heights 138kV to White Oak. Reconductor any existing 1-795AAC limiting conductor to 2-959ACSS. Remove existing Heights 7.2 MVAR cap bank from Heights TR1.
ERCOT project 73578D
CNP
Tier 4
Planned
Current-year planned tab
138 Oct 2026 Heights to San Felipe/White Oak
Harris County
Heights, San Felipe, White Oak
Heights 138kV Loop Conversion
Remove White Oak auto A2/A4 and remaining 69kV facilities
ERCOT project 73578E
CNP
Tier 4
Planned
Current-year planned tab
138 Oct 2026 White Oak
Harris County
White Oak
Heights 138kV Loop Conversion
Convert Eureka to double-tap service. Tap Ckt.09D to create new Ckt.09D San Felipe to Eureka TR2/TR3 tap to White Oak. Reconductor Ckt.09D Eureka TR2/TR3 tap to White Oak to increase thermal limits. Upgrade San Felipe line relaying Ckt.09D San Felipe to White Oak.
ERCOT project 73578K
CNP
Tier 4
In-Service
Completed tab
138 May 2025
actual 2025-05
San Felipe to White Oak
Harris County
San Felipe, White Oak
Addicks 345kV to White oak Ckt.71B Upgrades
Upgrade Ckt.71B Addicks to White Oak to increase thermal limits
ERCOT project 87344
CNP
Tier 4
In-Service
Completed tab
345 Feb 2026
actual 2026-01
Addicks to White Oak
Harris County
Addicks, White Oak
Install (2) new 100 MVA distribution transformers at Liberty substation to serve customer load.
Install (1) new 100 MVA distribution transformer on ckt.03 at Liberty substation to serve customer load.
ERCOT project 87637A
CNP
Tier 4
Planned
Current-year planned tab
138 Dec 2026 Liberty-new distribution tap to White Oak/ Greens Bayou Plant
Harris County
Liberty-new distribution tap, White Oak, Greens Bayou Plant

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 202687637AFirst listedon the Current-year planned tab
June 1, 2026103878First listedon the Future tab
June 1, 202687344Moved between tabsCurrent-year planned → Completed
June 1, 202687344Status as reportedPlanned → In-Service
June 1, 202687344Projected in-service dateJan 2026 → Feb 2026
February 1, 202673578DMoved between tabsFuture → Current-year planned
February 1, 202673578DProjected in-service dateMay 2026 → Oct 2026
February 1, 202673578EMoved between tabsFuture → Current-year planned
February 1, 202673578EProjected in-service dateMay 2026 → Oct 2026
February 1, 202687344Projected in-service dateDec 2025 → Jan 2026
June 1, 202573371HStatus as reportedPlanned → In-Service
June 1, 202573578CMoved between tabsFuture → Completed
June 1, 202573578CStatus as reportedPlanned → In-Service
June 1, 202573578KMoved between tabsFuture → Completed
June 1, 202573578KStatus as reportedPlanned → In-Service
June 1, 202587344Moved between tabsFuture → Current-year planned
February 1, 202573371HMoved between tabsFuture → Completed
February 1, 202573371HProjected in-service dateNov 2024 → Jan 2025
February 1, 202573578KFirst listedon the Future tab
February 1, 202587344Projected in-service dateOct 2026 → Dec 2025
October 1, 202473371HMoved between tabsCompleted → Future
October 1, 202473371HProjected in-service dateMay 2024 → Nov 2024
October 1, 202473578CProjected in-service dateDec 2025 → May 2025
October 1, 202473578DProjected in-service dateDec 2025 → May 2026
October 1, 202473578EProjected in-service dateDec 2025 → May 2026
October 1, 202487344First listedon the Future tab
June 1, 202473371HMoved between tabsFuture → Completed

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.