Stafford, VA interconnection queue
2 active projects totalling 252.9 MW in the PJM queue, plus 3 with terminal status (shown greyed).
2active projects
252.9active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1024 | Not reported | n/r | 250 | Battery | Withdrawn |
| C01-1240 | Garrisonville 230 kV | 230 | 250 | Battery | Active |
| T10 | Stafford Regional LF | 34.5 | 3 | Gas | Deactivated |
| C01-1210 | Cranes Corner 34.5 kV | 34.5 | 2.9 | Solar | Active |
| Q71 | Strafford Regional LF | 13.2 | 2 | Gas | Deactivated |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.