White Marsh substation interconnection queue
1 active project totaling 12 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name White Marsh as the point of interconnection, all in Gloucester County, VA.
Target commercial operation dates as filed run from Jul 2022 to Dec 2025 (3 filings).
1active projects
12active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-318 | White Marsh 34.5 kV | 34.5 | 12.8 | Battery | Withdrawn | Dec 2025 |
| AF2-077 | Winterberry Solar | 34.5 | 12 | Solar | In Service | Aug 2024 |
| AG1-102 | White Marsh 34.5 kV | 34.5 | 6.2 | Battery | Withdrawn | Jul 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Gloucester County, VA
- Harmony Village-Shackleford: 9 active, 146.6 MW of 11 filed
- Wan: 2 active, 25 MW of 2 filed
- Shacklefords: 2 active, 10.2 MW of 2 filed
- Papermill Tap - Harmony Village: none active of 2 filed