Wan substation interconnection queue
2 active projects totaling 25 MW in the PJM queue.
2 PJM queue filings name Wan as the point of interconnection, all in Gloucester County, VA.
Target commercial operation dates as filed run from May 2019 to Aug 2027 (2 filings). 1 active filing targets a date after November 27, 2026.
2active projects
25active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD2-030 | Gloucester Solar | 34.5 | 13.1 | Solar | In Service | May 2019 |
| AF2-054 | Camellia Solar | 34.5 | 11.9 | Solar | In Service | Aug 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Gloucester County, VA
- Harmony Village-Shackleford: 9 active, 146.6 MW of 11 filed
- White Marsh: 1 active, 12 MW of 3 filed
- Shacklefords: 2 active, 10.2 MW of 2 filed
- Papermill Tap - Harmony Village: none active of 2 filed
Site Scanner