Papermill Tap - Harmony Village substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1603 Papermill Tap - Harmony Village 230 kV 230 90 Solar Withdrawn
C01-1604 Papermill Tap - Harmony Village 230 kV 230 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.