6 active projects totalling 121.2 MW in the PJM queue, plus 8 with terminal status (shown greyed).

6active projects
121.2active MW
14total filed
Queue IDProjectkVMWResourceStatus
B49 Erie South-Warren 230kV 230 500 Gas Withdrawn
G40 Warren 230kV 230 260 Gas Withdrawn
B20 Elm St. 115kV 115 70 Gas Withdrawn
S103 Warren Generating Station 115 57 Gas In Service
Y2-055 United Refining Company Oil Refinery 34.5 29 Gas Withdrawn
AF1-103 Warren 34.5 kV 34.5 20 Hybrid Withdrawn
Z1-087 Seneca Pumped Storage Generating Station 230 17 Hydro In Service
Q63 Seneca Pumped Storage Generating Station Unit 1 230 16 Hydro In Service
S05 Seneca Pumped Generating Station Unit 2 230 16 Hydro In Service
AG1-481 Warren 34.5 kV 34.5 15.5 Hybrid Withdrawn
AG2-200 North Warren - Russell 34.5 kV 34.5 10.2 Solar Active
AI1-142 Warren-National Forge 34.5 kV 34.5 6.5 Solar Withdrawn
AH2-318 Corry East 34.5 kV 34.5 6 Solar Withdrawn
AF1-177 Warren Generating Station 115 5 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.