Virginia Beach substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-066 | Virginia Beach 230 kV | 230 | 163.3 | Offshore Wind | Withdrawn |
| AE1-065 | Virginia Beach 230 kV | 230 | 158.9 | Offshore Wind | Withdrawn |
| AE1-067 | Virginia Beach 230 kV | 230 | 148.5 | Offshore Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.