Birdneck-Landstown substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-123 | Birdneck-Landstown 230 kV | 230 | 163.3 | Offshore Wind | Withdrawn |
| AE2-122 | Birdneck-Landstown 230 kV | 230 | 158.9 | Offshore Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.