Birdneck-Landstown substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE2-123 Birdneck-Landstown 230 kV 230 163.3 Offshore Wind Withdrawn
AE2-122 Birdneck-Landstown 230 kV 230 158.9 Offshore Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.