Pendleton substation interconnection queue
1 active project totaling 11.2 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Pendleton as the point of interconnection, all in City of Virginia Beach, VA.
Target commercial operation dates as filed run from Nov 2017 to Jan 2018 (2 filings).
1active projects
11.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| W3-043 | Pendleton 230 kV | 230 | 65 | Offshore Wind | Withdrawn | Nov 2017 |
| AC1-027 | Oceana Solar Facility | 34.5 | 11.2 | Solar | In Service | Jan 2018 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in City of Virginia Beach, VA
- Birdneck: 1 active, 1.5 MW of 2 filed
- Virginia Beach: none active of 3 filed
- Birdneck-Landstown: none active of 2 filed
- Landstown: none active of 2 filed
- Oceana: none active of 2 filed
Site Scanner