Birdneck substation interconnection queue

1 active project totalling 1.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
1.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
Z1-068 Birdneck 34.5kV 34.5 1.5 Offshore Wind In Service
AD1-089 Birdneck 34.5 kV 34.5 1.3 Offshore Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.