Birdneck substation interconnection queue
1 active project totalling 1.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
1.5active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Z1-068 | Birdneck 34.5kV | 34.5 | 1.5 | Offshore Wind | In Service |
| AD1-089 | Birdneck 34.5 kV | 34.5 | 1.3 | Offshore Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.