Substation Scout

Trumbull substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AJ1-023 Trumbull 345 kV 345 70 Gas Withdrawn
C01-1042 Trumbull 345 kV 345 70 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.