Trumbull substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Trumbull as the point of interconnection, all in Trumbull County, OH.
Target commercial operation dates as filed run from Dec 2024 to May 2026 (2 filings).
Transmission owner as filed: ATSI (1 filing).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AJ1-023 | Trumbull 345 kV | 345 | 70 | Gas | Withdrawn | Dec 2024 |
| C01-1042 | Trumbull 345 kV | 345 | 70 | Gas | Withdrawn | May 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Trumbull County, OH
- Highland-Sammis & Highland-Mansfield: 2 active, 864 MW of 2 filed
- Highland-Hanna: 1 active, 850 MW of 2 filed
- Lordstown: 4 active, 556 MW of 4 filed