Lordstown substation interconnection queue

4 active projects totaling 556 MW in the PJM queue.

4 PJM queue filings name Lordstown as the point of interconnection, all in Trumbull County, OH.

Target commercial operation dates as filed run from Nov 2027 to Jan 2031 (4 filings). 4 active filings target a date after November 27, 2026.

Transmission owner as filed: ATSI (4 filings).

4active projects
556active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1492 Lordstown 345 kV 345 260 Gas Active Jan 2031
C01-1272 Lordstown 345 kV 345 250 Battery Active Apr 2029
AH1-706 Lordstown Energy Center 1 CC 345 23.8 Gas EP Nov 2027
C01-1491 Lordstown 345 kV 345 22.2 Gas Active Oct 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-09-07AH1-706Status changen/a Active → EP

Other PJM queue substations in Trumbull County, OH

All 20 PJM queue filings in Trumbull County, OH.