Lordstown substation interconnection queue
4 active projects totaling 556 MW in the PJM queue.
4 PJM queue filings name Lordstown as the point of interconnection, all in Trumbull County, OH.
Target commercial operation dates as filed run from Nov 2027 to Jan 2031 (4 filings). 4 active filings target a date after November 27, 2026.
Transmission owner as filed: ATSI (4 filings).
4active projects
556active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1492 | Lordstown 345 kV | 345 | 260 | Gas | Active | Jan 2031 |
| C01-1272 | Lordstown 345 kV | 345 | 250 | Battery | Active | Apr 2029 |
| AH1-706 | Lordstown Energy Center 1 CC | 345 | 23.8 | Gas | EP | Nov 2027 |
| C01-1491 | Lordstown 345 kV | 345 | 22.2 | Gas | Active | Oct 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-07 | AH1-706 | Status change | n/a | Active → EP |
Other PJM queue substations in Trumbull County, OH
- Highland-Sammis & Highland-Mansfield: 2 active, 864 MW of 2 filed
- Highland-Hanna: 1 active, 850 MW of 2 filed
- Trumbull: none active of 2 filed