Substation Scout

Trumbull, OH interconnection queue

9 active projects totalling 2,291.5 MW in the PJM queue, plus 11 with terminal status (shown greyed).

9active projects
2,291.5active MW
20total filed
Queue IDProjectkVMWResourceStatus
AE1-213 Highland-Lordstown 1 & 2 345 kV 345 1,025 Gas Withdrawn
AE2-013 Highland-Lordstown 345 kV 345 1,025 Gas Withdrawn
AB1-105 Trumbull Energy Center 345 850 Gas In Service
AD2-057 Highland-Hanna 345kV 345 850 Gas Withdrawn
Z2-028 Lordstown Energy Center 345 800 Gas In Service
C01-1492 Lordstown 345 kV 345 260 Gas Active
C01-1272 Lordstown 345 kV 345 250 Battery Active
Z1-034 Niles 138kV 138 217 Gas Withdrawn
AJ1-023 Trumbull 345 kV 345 70 Gas Withdrawn
C01-1042 Trumbull 345 kV 345 70 Gas Withdrawn
AB1-017 Lordstown Energy Center 345 64 Gas In Service
AH2-239 Trumbull138 kV 138 46.4 Hybrid Withdrawn
AH1-706 Lordstown 345 kV 345 23.8 Gas Active
C01-1491 Lordstown 345 kV 345 22.2 Gas Active
AF2-044 Lordstown Energy Center 345 20 Gas In Service
AG2-251 Dilworth 69 kV 69 17.4 Solar Withdrawn
AG2-252 Dilworth 69 kV II 69 12 Solar Withdrawn
AG2-253 Dilworth 69 kV III 69 12 Solar Withdrawn
AF1-189 Niles A CT 23 1.5 Other In Service
AB1-015 Warren Natural Gas Generation Faciility 138 0 Gas Deactivated

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.