Spotsylvania Energy Center
PJM queue ID AC1-158
Spotsylvania Energy Center (AC1-158) is listed in the PJM interconnection queue as a 337 MW solar project in Spotsylvania County, VA. The filing names Spotsylvania as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2022.
| Queue ID | AC1-158 |
|---|---|
| Project name | Spotsylvania Energy Center |
| Status (as published) | In Service |
| Substation | Spotsylvania |
| Point of interconnection | Spotsylvania 500kV |
| County | Spotsylvania |
| State | VA |
| Voltage | 500 kV |
| Capacity | 337 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2022-12-31 |
| Source dataset | serial |
Same substation and county
Spotsylvania substation: 6 requests in the PJM queue, 1 active totaling 337 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1370 | Spotsylvania 500 kV | 400 | Battery | Withdrawn |
| AD2-193 | Spotsylvania 500 kV | 208.5 | Solar | Withdrawn |
| AE1-047 | Spotsylvania 500 kV | 208.5 | Solar | Withdrawn |
| AI2-183 | Spotsylvania 500kV | 123.8 | Solar | Withdrawn |
| AG2-318 | Spotsylvania 115 kV | 75 | Battery | Withdrawn |
Spotsylvania, VA: 17 requests in the PJM queue, 5 active totaling 1,337 MW.
A substation with the same name is named in PJM transmission planning materials: Spotsylvania (DOM, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 485 |
| MW capacity | 337 |
| MFO | 485 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.