Substation Scout

South Lebanon substation interconnection queue

1 active project totalling 673 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
673active MW
2total filed
Queue IDProjectkVMWResourceStatus
A01 Ironwood 230 673 Gas In Service
C02 Ironwood 230 47 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.