Heidelberg substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Heidelberg as the point of interconnection, all in Lebanon County, PA.
Target commercial operation dates as filed run from Jul 2024 to May 2027 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-523 | Heidelberg 69 kV | 69 | 12 | Solar | Withdrawn | Jul 2024 |
| AI2-484 | Heidelberg 69 kV | 69 | 5.8 | Solar | Withdrawn | May 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Lebanon County, PA
- South Lebanon: 1 active, 673 MW of 2 filed
- Ironwood: 2 active, 119.8 MW of 5 filed
- North Lebanon: 1 active, 3.2 MW of 3 filed
- N. Lebanon: 1 active, 1.2 MW of 2 filed
- Campbelltown-Millars Quarry: none active of 3 filed