Ironwood substation interconnection queue
2 active projects totaling 119.8 MW in the PJM queue, plus 3 with terminal status (shown grayed).
5 PJM queue filings name Ironwood as the point of interconnection, all in Lebanon County, PA.
Target commercial operation dates as filed run from Dec 2005 to Jun 2025 (5 filings).
Transmission owner as filed: ME (1 filing).
2active projects
119.8active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-561 | Ironwood Battery Storage | 230 | 250 | Battery | Withdrawn | Jun 2025 |
| H21 | Ironwood 230kV | 230 | 100 | Gas | Withdrawn | Dec 2005 |
| AD2-166 | Helix Ironwood Facility | 230 | 89.8 | Gas | In Service | Apr 2022 |
| AC1-035 | Helix Ironwood Facility | 230 | 30 | Gas | In Service | May 2018 |
| V3-057 | Ironwood 230kV | 230 | 0 | Battery | Withdrawn | Mar 2011 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Lebanon County, PA
- South Lebanon: 1 active, 673 MW of 2 filed
- North Lebanon: 1 active, 3.2 MW of 3 filed
- N. Lebanon: 1 active, 1.2 MW of 2 filed
- Campbelltown-Millars Quarry: none active of 3 filed
- Heidelberg: none active of 2 filed