Substation Scout

Ironwood substation interconnection queue

2 active projects totaling 119.8 MW in the PJM queue, plus 3 with terminal status (shown grayed).

5 PJM queue filings name Ironwood as the point of interconnection, all in Lebanon County, PA.

Target commercial operation dates as filed run from Dec 2005 to Jun 2025 (5 filings).

Transmission owner as filed: ME (1 filing).

2active projects
119.8active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-561 Ironwood Battery Storage 230 250 Battery Withdrawn Jun 2025
H21 Ironwood 230kV 230 100 Gas Withdrawn Dec 2005
AD2-166 Helix Ironwood Facility 230 89.8 Gas In Service Apr 2022
AC1-035 Helix Ironwood Facility 230 30 Gas In Service May 2018
V3-057 Ironwood 230kV 230 0 Battery Withdrawn Mar 2011

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Lebanon County, PA

All 27 PJM queue filings in Lebanon County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first