Snake Spring substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Q04 | Snake Spring 115kV | 115 | 28 | Wind | Withdrawn |
| AI2-476 | Snake Spring 115 kV | 115 | 5.8 | Solar | Withdrawn |
| AI2-479 | Snake Spring 115 kV | 115 | 5.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.