Clearville-Clearville Junction substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-079 | Clearville-Clearville Junction 34.5 kV | 34.5 | 13.3 | Solar | Withdrawn |
| AF1-131 | Clearville-Clearville Junction 34.5 kV | 34.5 | 9.7 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.