Substation Scout

Snake Spring II substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF2-337 Snake Spring 115 kV II 115 12 Solar Withdrawn
AI2-477 Snake Spring 115 kV II 115 5.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.