Bedford, PA interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 34 with terminal status (shown greyed).

0active projects
0active MW
34total filed
Queue IDProjectkVMWResourceStatus
AE1-128 Bedford North-Wills Mounain 115 kV 115 72 Hybrid Withdrawn
AH2-229 Bedforth North 115 kV 115 50 Battery Withdrawn
AH1-246 Osterberg 115kV 115 48 Solar Withdrawn
Q04 Snake Spring 115kV 115 28 Wind Withdrawn
Q62 Sayton -Snake Spring 115kV 115 20 Wind Withdrawn
S49 Bedford 115kV 115 18 Wind Withdrawn
O56 Dunning Mountain WF 115 15.2 Wind Withdrawn
AG2-079 Clearville-Clearville Junction 34.5 kV 34.5 13.3 Solar Withdrawn
AF1-288 Curryville-Claysburg 115 kV I 115 12 Solar Withdrawn
AF1-289 Curryville-Claysburg 115 kV II 115 12 Solar Withdrawn
AF2-336 Snake Spring Solar I & II 115 12 Solar Withdrawn
AF2-337 Snake Spring 115 kV II 115 12 Solar Withdrawn
AF2-338 Snake Spring 115 kV III 115 12 Solar Withdrawn
AF2-339 Snake Spring 115 kV IV 115 12 Solar Withdrawn
AH1-162 ASD Woodbury PA2 Solar I 23 11 Solar Withdrawn
AE2-249 BE-ASTOR 23 10 Solar Withdrawn
AF1-131 Clearville-Clearville Junction 34.5 kV 34.5 9.7 Solar Withdrawn
AI1-063 Bear Peak East St. Clair 23 kV 23 9 Solar Withdrawn
AF2-092 Magenta Solar 23 7.2 Solar Withdrawn
AG1-041 Salt Solar 23 7.2 Solar Withdrawn
AI2-476 Snake Spring 115 kV 115 5.8 Solar Withdrawn
AI2-477 Snake Spring 115 kV II 115 5.8 Solar Withdrawn
AI2-478 Snake Spring 115 kV III 115 5.8 Solar Withdrawn
AI2-479 Snake Spring 115 kV 115 5.8 Solar Withdrawn
AF1-255 Osterburg-Claysburg 23 kV 23 5.7 Solar Withdrawn
AH2-022 Bear Peak West Providence LLC n/r 5 Solar Withdrawn
AG1-339 Curryville-RKB-Yellow Creek 23 kV II 23 4.6 Solar Withdrawn
AI1-044 Breezewood 12.47 kV 12.5 4.5 Solar Withdrawn
AG1-338 Curryville-RKB-Yellow Creek 23 kV I 23 4.4 Solar Withdrawn
AI2-306 Osterburg - Bedford North 23 kV II 23 4.4 Solar Withdrawn
AI2-308 Snake Spring-Bedford Area 23 kV 23 4.4 Solar Withdrawn
AG1-340 Curryville 23 kV 23 3.2 Hybrid Withdrawn
AH2-008 Bear Peak East Providence II n/r 3 Solar Withdrawn
AF2-270 BE-Chalybeate 23 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.