Snake Spring-Bedford Area substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF2-092 Magenta Solar 23 7.2 Solar Withdrawn
AI2-308 Snake Spring-Bedford Area 23 kV 23 4.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.